Myrmidone Ride

Myrmidone Ride


535600 Székelyudvarhely, Románia

About

Another Myrmidone Ride is planned for Saturday! This time, we’re heading around Korond, starting from Odorheiu Secuiesc.

The route is 117 km with 2,200 m of elevation gain, 100% on asphalt. Along the way, we’ll have two longer stops and regrouping points: Énlaka – Tünde Vegyesüzlet and Păuleni – Nimród Inn.

And since it’s a Myrmidone Ride, food is part of the plan too! On the way back, we’ll stop at Kotyogó Restaurant in Lupeni, proudly holding 3 Myrmidone butterflies, around kilometre 104. Who knows, maybe there’ll even be goulash on the menu this time.
Almost a perfect plan: asphalt, climbs, rest stops and something delicious at the end. What could possibly go wrong? 

Everyone is welcome!